Circor Pipeline Engineering delivers quick turnaround  

Pump protection and move management expertise firm Circor Pipeline Engineering has supplied a buyer with a rapid opening closure (ROC) for a 48-in gas filter vessel within 10 weeks.
A ROC offers a fast opening access point to pipelines or stress vessels, for the installation or removal of kit.
Built by Pipeline Engineering in Catterick, UK, the 48-in ASME U-Stamp large ROC closure needed to be delivered to the customer in Houston, Texas in 10 weeks. It was built and delivered on time using the model new large Vertical Turning Center (VTC) put in in Catterick in 2020 to reduce manufacturing lead time.
Following เพรสเชอร์เกจ , Pipeline Engineering provided support with set up and welding from its Houston facility.
ไดอะแฟรม has been geared up with the new CIRCORSmart tag for traceability, document access and simple customer assistance when it goes into operation.
Share

Scroll to Top